June 21, 2015
Yesterday, in the shade of some sugar maples, we started on the sugarhouse addition. This add on will house a large tank. The tank will have two jobs. It will hold over 1200 gallons of sap waiting to be boiled and it will be the tank that feeds the evaporator. Boiling maple sap is a continuous process, so having the incoming sap readily available is very important. The big tank will replace the old tanks in the foreground of this photo.
The boards on the new addition, down low, are a temporary thing to keep the sheep from taking up residence under the building. I don’t mind them there, it’s the manure they would leave behind that I want to avoid! The building went up fast, thanks in part to all the help from my friend Marvin and his sons. We had a good time in the shade of those trees, while working together 😮
We had enough time for the young boys to fish for bass in the farm pond. We drank coffee and cold drinks, shared a meal and lots of conversation. Piece by piece the building took shape. The roof and siding are all that remains to finish. A pair of doors on the west side will be built. The door will allow for easy installation of the big tank. A set of stairs will be built inside the sugarhouse for easy entry to the new space, then this project will be complete.
The best part of this whole project for me, will be the ability to stand next to the tank and clean it out easily. The drain will direct wash water outside. I have struggled for the last four years with my old system. I could get the job done, but man was it ever difficult! This new addition, built under the trees, by me and my friends will serve us well for the rest of my life.
Leave a Comment so far
Leave a comment